Our projects.
Gingin. (WA)
Currently under supply and construction, this plant will be used to demonstrate and obtain independent verification of the efficacy of our solution in Australia. This is the first incarnation of our new stainless-steel tank design incorporating the re-designed log material, allowing us to improve the mobility, speed of commissioning, durability and carbon-footprint of the solution.
Indiana.
In operation since 2014, the plant Summit Lake State Park in Indiana has been maintained and operated by the park rangers since it was commissioned and has consistently exceeded EPA requirements, despite them having been tightened. This was the first commercial build of our design, which has since been significantly upgraded to increase efficacy while reducing processing times and footprint.
This facility had a design capacity of 275 m3/d and replaced the 200 m3/d facility which you can see pictured on the left.
It took 12 weeks to build of which 3 weeks were for concrete curing.